Strong brigade environment

劲旅

Environmental Service

Environmental Service Center

Strong brigade environment

Bengshan District Municipal Solid Waste Transfer Center DBO Project

Bengshan District Municipal Solid Waste Transfer Center DBO Project

The Bangshan District Municipal Solid Waste Transfer Center covers an area of 12 acres, with a building area of approximately 8,004 square meters. The office area is about 800 square meters, the waste transfer station is around 4,400 square meters, the road area is 2,100 square meters, and the green area is approximately 2,200 square meters. The designed capacity is to process 500 tons of municipal solid waste per day. As an intelligent municipal solid waste transfer center, it is equipped with an intelligent measurement system and utilizes a horizontal pre-compression technology, which results in a high waste compaction density and efficient waste processing. This can reduce the number of transport trips and lower transportation costs. The operation of this transfer center will effectively and orderly carry out the municipal solid waste transfer work, covering the communities in the southern area of Bangshan District. It can collect and transport municipal solid waste in a timely manner, effectively saving time during the waste collection and transportation process, improving the efficiency of waste collection, eliminating the accumulation of waste, and ensuring that municipal solid waste is cleared daily. Additionally, the Bangshan District Municipal Solid Waste Transfer Center allows for the cleaning of vehicle bodies and wheels at any time, avoiding visual and olfactory pollution. The waste is automatically sealed and operated from "coming in" to "going out," ensuring that no waste is visible, no odors are detectable, and no pollution is generated.